22nd February – site visit
Feb 23 2011 in Uncategorized by bere:architects
Below are some photos from our site visit today that show the progress that is being made on site. The windows have been installed to the front elevation and work to the extension is progressing. Unfortunately, upon inspection the air-tightness membrane to the extension was not correctly installed and the contractors were instructed to remove these works and re-install the membrane correctly so that membranes are taped where they meet to ensure a continuous airtight seal.